Week #5
Week 5 Day 2
Since your balance exceed 800M, it is time to add one more wave of planes on your first circuit on MPM (MPM-C01).
Using the seat configurator, add your MPM routes and choose "Wave/NB=2" like so:
Update the prices for those routes as per the tool.
Order 7 the planes as the seat configuration dictate you based on the recent audit.
The proposed configuration should still be 300 eco, 0 business, 0 first, 10T of cargo.
Reconfigure the 7 planes of MPM-C01 to unlock their cargo and matching the seat configuration of the 7 planes you just order.
In this case, this should not change your seating, but you need to add the 10T of cargo.
Once planes are received, schedule them.